Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:tunnel
|
| gptkbp:builtBy |
gptkb:China_State_Construction_Engineering
|
| gptkbp:connects |
gptkb:North_Lantau
gptkb:Yuen_Long |
| gptkbp:constructionStartYear |
2013
|
| gptkbp:length |
3.4 km
|
| gptkbp:location |
gptkb:Hong_Kong
|
| gptkbp:numberOfLanes |
2 per direction
|
| gptkbp:opened |
27 December 2020
|
| gptkbp:operator |
gptkb:Highways_Department_(Hong_Kong)
|
| gptkbp:partOf |
gptkb:Tuen_Mun–Chek_Lap_Kok_Link
Route 11 (Hong Kong) |
| gptkbp:passesThrough |
Lung Shan (Dragon Hill)
|
| gptkbp:toll |
no
|
| gptkbp:type |
gptkb:road
|
| gptkbp:bfsParent |
gptkb:Heung_Yuen_Wai_Highway
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Lung Shan Tunnel
|