Lower Tamakoshi Hydroelectric Project
GPTKB entity
Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:annualGeneration |
2,281 GWh
|
| gptkbp:capacity |
456 MW
|
| gptkbp:commissioned |
2021
|
| gptkbp:constructionStartYear |
2011
|
| gptkbp:cost |
NPR 49.29 billion
|
| gptkbp:country |
gptkb:Nepal
|
| gptkbp:dam |
gptkb:concrete_gravity_dam
|
| gptkbp:fundedBy |
domestically funded
|
| gptkbp:gridConnection |
Nepal national grid
|
| gptkbp:hasTower |
6
|
| gptkbp:headOfState |
822 m
|
| gptkbp:location |
gptkb:Dolakha_District
|
| gptkbp:owner |
gptkb:Nepal_Electricity_Authority
|
| gptkbp:purpose |
electricity generation
|
| gptkbp:river |
gptkb:Tamakoshi_River
|
| gptkbp:significance |
largest hydropower project in Nepal
|
| gptkbp:status |
operational
|
| gptkbp:turbineType |
gptkb:Francis
|
| gptkbp:type |
run-of-the-river
|
| gptkbp:bfsParent |
gptkb:Tamakoshi
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Lower Tamakoshi Hydroelectric Project
|