Lower Subansiri Hydroelectric Project
GPTKB entity
Statements (25)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:capacity |
2000 MW
|
| gptkbp:constructionStartYear |
2005
|
| gptkbp:country |
gptkb:India
|
| gptkbp:dam |
gptkb:concrete_gravity_dam
|
| gptkbp:expectedCommissioning |
2024
|
| gptkbp:hasTower |
8
|
| gptkbp:height |
116 m
|
| gptkbp:length |
284 m
|
| gptkbp:locatedOnRiver |
gptkb:Subansiri_River
|
| gptkbp:location |
gptkb:Arunachal_Pradesh
gptkb:Assam |
| gptkbp:operator |
gptkb:NHPC_Limited
|
| gptkbp:postponedDueTo |
environmental concerns
local protests |
| gptkbp:purpose |
power generation
|
| gptkbp:region |
gptkb:Northeast_India
|
| gptkbp:reservoirCapacity |
1.37 billion cubic meters
|
| gptkbp:runsThrough |
gptkb:NHPC_Limited
|
| gptkbp:status |
under construction
|
| gptkbp:turbineType |
Francis-type
|
| gptkbp:bfsParent |
gptkb:Subansiri_River
gptkb:Subansiri |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Lower Subansiri Hydroelectric Project
|