Statements (23)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:infrastructure
|
gptkbp:capacity |
760,000 barrels per day
|
gptkbp:completedIn |
2021
|
gptkbp:constructionStartYear |
2017
|
gptkbp:controversy |
environmental concerns
Indigenous rights opposition |
gptkbp:cost |
approximately $4 billion
|
gptkbp:environmentalImpact |
required
|
https://www.w3.org/2000/01/rdf-schema#label |
Line 3 Replacement Program
|
gptkbp:issuedBy |
gptkb:U.S._Army_Corps_of_Engineers
gptkb:Minnesota_Public_Utilities_Commission |
gptkbp:legalChallenge |
multiple lawsuits
|
gptkbp:length |
337 miles (Minnesota segment)
|
gptkbp:location |
gptkb:Minnesota
|
gptkbp:operatedBy |
gptkb:Enbridge
|
gptkbp:pipeline |
crude oil pipeline
|
gptkbp:protestedBy |
Water Protectors
|
gptkbp:purpose |
replace aging pipeline infrastructure
|
gptkbp:replacedBy |
gptkb:Enbridge_Line_3
|
gptkbp:route |
Alberta, Canada to Superior, Wisconsin
|
gptkbp:status |
operational as of October 2021
|
gptkbp:bfsParent |
gptkb:Enbridge_Line_3
|
gptkbp:bfsLayer |
7
|