Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:oil
|
gptkbp:capacity |
25.5 billion cubic meters per year
|
gptkbp:commissioned |
2006
|
gptkbp:constructionStartYear |
2004
|
gptkbp:country |
gptkb:Norway
gptkb:United_Kingdom |
gptkbp:diameter |
42 inches
|
gptkbp:endPoint |
Easington, United Kingdom
|
https://www.w3.org/2000/01/rdf-schema#label |
Langeled pipeline
|
gptkbp:length |
1166 km
|
gptkbp:location |
gptkb:North_Sea
|
gptkbp:notable_for |
one of the longest subsea pipelines in the world
|
gptkbp:operator |
gptkb:Equinor
|
gptkbp:part_of |
Ormen Lange project
|
gptkbp:purpose |
transport natural gas from Norway to UK
|
gptkbp:startPoint |
Nyhamna, Norway
|
gptkbp:bfsParent |
gptkb:Ormen_Lange_field
gptkb:Ormen_Lange_gas_field gptkb:North_Sea_gas_fields |
gptkbp:bfsLayer |
8
|