Lane Cove Tunnel

GPTKB entity

Statements (59)
Predicate Object
gptkbp:instanceOf tunnel
gptkbp:air_traffic_control integrated
gptkbp:built approximately 3 years
gptkbp:connects gptkb:Warringah_Freeway
gptkb:M1_Pacific_Motorway
gptkbp:construction_cost $1.1 billion
gptkbp:emergencyServices provided via ventilation shafts
gptkbp:environmental_impact minimized through design
gptkbp:features multiple lanes
landscaping
sustainability practices
toll booths
community engagement initiatives
emergency lanes
public art installations
road markings
lighting systems
information displays
ventilation systems
emergency communication systems
sound barriers
traffic signs
traffic monitoring systems
environmental monitoring systems
noise reduction measures
roadside assistance services
access for disabled persons
emergency response training facilities
road safety education programs
traffic signal control systems
water drainage systems
incident detection systems
underground tunnel
pedestrian access points
bicycle access points
https://www.w3.org/2000/01/rdf-schema#label Lane Cove Tunnel
gptkbp:is_designed_to gptkb:Baulderstone_Hornibrook
AECOM
gptkbp:is_part_of gptkb:Sydney_Orbital_Network
Sydney's_public_transport_network
gptkbp:length 3.6 km
gptkbp:lighting LED technology
gptkbp:location gptkb:Sydney,_Australia
gptkbp:maintenance performed by Transurban
gptkbp:opened 2007
gptkbp:openedIn gptkb:New_South_Wales_Government
gptkbp:operator Transurban
gptkbp:passenger_traffic December 2007
approximately 60,000 vehicles per day
improved in surrounding areas
gptkbp:provides_access_to gptkb:North_Sydney
gptkb:Lane_Cove
gptkb:Chatswood
gptkbp:safety_features CCTV surveillance
emergency exits
fire suppression system
gptkbp:toll true
electronic tolling
gptkbp:travelTime between_North_Shore_and_CBD