LRT Line 1 Cavite Extension

GPTKB entity

Statements (49)
Predicate Object
gptkbp:instanceOf railway line
gptkbp:communityImpact Economic development
Increased property values
Job creation
Improved quality of life
Enhanced mobility
gptkbp:connects gptkb:Dasmariñas_Station
gptkb:Tanza_Station
gptkb:Baclaran_Station
gptkb:Bacoor_Station
gptkb:Niog_Station
gptkb:Gen._Trias_Station
gptkb:Cavite_City_Station
Imus_Station
gptkbp:constructionStarted 2016
gptkbp:electrification 1500 V DC
gptkbp:environmentalImpact Reduced traffic congestion
Lower carbon emissions
Improved air quality
Increased public transport accessibility
gptkbp:futurePlans Cavite City to Dasmariñas
Cavite_City_to_Bacoor
Cavite_City_to_Gen._Trias
Cavite_City_to_Imus
Cavite_City_to_Noveleta
Cavite_City_to_Rosario
Cavite_City_to_Tanza
https://www.w3.org/2000/01/rdf-schema#label LRT Line 1 Cavite Extension
gptkbp:is_funded_by gptkb:Japan_International_Cooperation_Agency
gptkb:Philippine_government
gptkbp:length 11.7 kilometers
gptkbp:location gptkb:Cavite,_Philippines
gptkbp:maxSpeed 60 km/h
gptkbp:numberOfStations 8
gptkbp:opened 2021
gptkbp:operator gptkb:Light_Rail_Transit_Authority
gptkbp:partOf gptkb:LRT_Line_1
gptkbp:passengerCapacity 200,000 passengers per day
gptkbp:project $1.2 billion
gptkbp:rollingStock Light rail vehicles
gptkbp:safetyFeatures CCTV surveillance
Automatic train protection
Platform screen doors
Emergency communication systems
Fire detection systems
gptkbp:services 10 minutes
gptkbp:serviceType Rapid transit
gptkbp:speed 30 km/h
gptkbp:track 1435 mm (standard gauge)