Lærdal Tunnel

GPTKB entity

Statements (54)
Predicate Object
gptkbp:instance_of gptkb:cave
gptkbp:bfsLayer 5
gptkbp:bfsParent gptkb:Lærdal
gptkb:Lærdal,_Norway
gptkbp:aircraft_operated gptkb:cave
modern standards
gptkbp:breathability mechanical ventilation system
gptkbp:challenges difficult terrain
gptkbp:climb_rate 4.5 meters
among longest in the world
gptkbp:connects gptkb:Lærdal
Aurland
gptkbp:constructed_in gptkb:1995
gptkb:2000
5 years
drilling and blasting
gptkbp:construction_cost approximately 1 billion NOK
gptkbp:cultural_significance gptkb:battle
gptkbp:designed_by gptkb:Norwegian_Public_Roads_Administration
gptkbp:educational_programs notable
gptkbp:emergency_services gptkb:battle
in place
reduced
gptkbp:enforces enhanced
gptkbp:environmental_impact minimal
considered low
gptkbp:explores multiple sections
gptkbp:features gptkb:computer
rest areas
emergency exits
gptkbp:future_plans maintenance upgrades
gptkbp:geographical_feature varied geology
gptkbp:habitat gptkb:stock_market_index
gptkbp:historical_significance high
facilitated
https://www.w3.org/2000/01/rdf-schema#label Lærdal Tunnel
gptkbp:landmark important infrastructure
gptkbp:length 24.5 kilometers
gptkbp:lighting LED lights
gptkbp:located_in gptkb:Norway
gptkbp:maintenance gptkb:Norwegian_Public_Roads_Administration
gptkbp:open_to_public gptkb:battle
gptkbp:opened gptkb:2000
gptkb:King_Harald_V_of_Norway
gptkbp:part_of gptkb:European_route_E16
gptkbp:safety_features CCTV monitoring
gptkbp:seating_capacity improved
motor vehicles
approximately 1,000 vehicles
advanced systems
gptkbp:significance longest road tunnel in the world at the time of opening
gptkbp:tourist_attraction gptkb:battle
gptkbp:transportation gptkb:battle
gptkbp:width 8.5 meters