Kurobe River Hydroelectric System
GPTKB entity
Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:capacity |
over 1,000 MW
|
| gptkbp:constructionStartYear |
1920s
|
| gptkbp:environmentalImpact |
altered river flow
|
| gptkbp:features |
multiple dams
underground power stations |
| gptkbp:includes |
gptkb:Kurobe_Dam
Arimine Dam Sennindani Dam Unazuki Dam |
| gptkbp:locatedIn |
gptkb:Japan
gptkb:Toyama_Prefecture |
| gptkbp:notableBuilding |
gptkb:Kurobe_Gorge_Railway
Kurobe No. 4 Power Station |
| gptkbp:notableEvent |
Kurobe Dam completed in 1963
|
| gptkbp:operatedBy |
gptkb:Kansai_Electric_Power_Company
|
| gptkbp:purpose |
electricity generation
|
| gptkbp:region |
gptkb:Chubu_region
|
| gptkbp:touristAttraction |
gptkb:Kurobe_Dam
|
| gptkbp:usesRiver |
gptkb:Kurobe_River
|
| gptkbp:bfsParent |
gptkb:Kurobe_Dam
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Kurobe River Hydroelectric System
|