Jatiluhur Hydroelectric Power Plant
GPTKB entity
Statements (27)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:alsoKnownAs |
gptkb:Waduk_Jatiluhur
Ir. H. Djuanda Dam |
gptkbp:capacity |
186 MW
|
gptkbp:commissioned |
1967
|
gptkbp:country |
gptkb:Indonesia
|
gptkbp:dam |
105 m
1,200 m concrete-faced rockfill dam |
gptkbp:designedBy |
gptkb:Coyne_et_Bellier
|
gptkbp:hasTower |
6
|
https://www.w3.org/2000/01/rdf-schema#label |
Jatiluhur Hydroelectric Power Plant
|
gptkbp:locatedOnRiver |
gptkb:Citarum_River
|
gptkbp:location |
gptkb:West_Java
|
gptkbp:nearestCity |
gptkb:Purwakarta
|
gptkbp:operator |
gptkb:Perum_Jasa_Tirta_II
|
gptkbp:purpose |
power generation
|
gptkbp:reservoirCapacity |
3,000,000,000 m³
|
gptkbp:reservoirName |
gptkb:Jatiluhur_Reservoir
|
gptkbp:secondaryPurpose |
gptkb:fish
gptkb:water_supply flood control irrigation recreation |
gptkbp:turbineType |
gptkb:Francis_turbine
|
gptkbp:bfsParent |
gptkb:Jatiluhur_Reservoir
|
gptkbp:bfsLayer |
7
|