Jalaur River Multipurpose Project
GPTKB entity
Statements (30)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:infrastructure
|
| gptkbp:benefit |
increase agricultural productivity
provide potable water Iloilo farmers generate hydroelectric power |
| gptkbp:country |
gptkb:Philippines
|
| gptkbp:executedBy |
gptkb:National_Irrigation_Administration
|
| gptkbp:fundedBy |
Korea Export-Import Bank
|
| gptkbp:hydroelectricCapacity |
6.6 MW
|
| gptkbp:includes |
Afterbay Dam
Alibunan Catch Dam Highline Canal Jalaur High Dam |
| gptkbp:irrigationArea |
31,840 hectares
|
| gptkbp:location |
gptkb:Iloilo
|
| gptkbp:mainContractor |
Daewoo Engineering & Construction Co. Ltd.
|
| gptkbp:mainRiver |
gptkb:Jalaur_River
|
| gptkbp:period |
Phase II
|
| gptkbp:projectCost |
11.2 billion pesos
|
| gptkbp:purpose |
gptkb:water_supply
flood control hydroelectric power irrigation |
| gptkbp:startYear |
2019
|
| gptkbp:status |
under construction
|
| gptkbp:waterSupplyCapacity |
86,400 cubic meters per day
|
| gptkbp:yearCompleted |
2024
|
| gptkbp:bfsParent |
gptkb:Jalaur_River
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Jalaur River Multipurpose Project
|