Jakarta–Bandung railway corridor
GPTKB entity
Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connects |
gptkb:Jakarta
gptkb:Bandung |
| gptkbp:gauge |
1,067 mm (narrow gauge)
|
| gptkbp:highSpeedRailGauge |
1,435 mm (standard gauge)
|
| gptkbp:highSpeedRailOpened |
2023
|
| gptkbp:includes |
Jakarta–Bandung high-speed railway
conventional railway line |
| gptkbp:length |
approximately 142 kilometers
|
| gptkbp:locatedIn |
gptkb:Indonesia
|
| gptkbp:opened |
late 19th century
|
| gptkbp:operatedBy |
gptkb:Kereta_Api_Indonesia
|
| gptkbp:purpose |
passenger transport
freight transport |
| gptkbp:serves |
gptkb:West_Java
gptkb:Jakarta_Special_Capital_Region |
| gptkbp:station |
gptkb:Gambir_Station
gptkb:Bandung_Station Tegalluar Station Halim Station |
| gptkbp:bfsParent |
gptkb:Manggarai–Padalarang_railway
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Jakarta–Bandung railway corridor
|