Interurban Trail (King County, Washington)
GPTKB entity
Statements (16)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:connects |
gptkb:Tukwila
gptkb:Kent gptkb:Auburn |
| gptkbp:country |
gptkb:United_States
|
| gptkbp:followsFormer |
gptkb:Puget_Sound_Electric_Railway
|
| gptkbp:length |
about 14 miles
|
| gptkbp:locatedIn |
gptkb:King_County,_Washington
|
| gptkbp:maintainedBy |
gptkb:King_County_Parks
|
| gptkbp:surface |
paved
|
| gptkbp:usedFor |
cycling
running walking |
| gptkbp:bfsParent |
gptkb:Interurban_Trail
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Interurban Trail (King County, Washington)
|