Statements (28)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam_project
|
| gptkbp:annualGeneration |
3,833 GWh
|
| gptkbp:capacity |
1200 MW
|
| gptkbp:causedSubmergenceOf |
gptkb:Hasankeyf
|
| gptkbp:constructionStartYear |
2006
|
| gptkbp:controversy |
environmental impact
displacement of people loss of cultural heritage |
| gptkbp:country |
gptkb:Turkey
|
| gptkbp:dam |
concrete-face rock-fill dam
|
| gptkbp:fundingWithdrawnBy |
European banks
|
| gptkbp:height |
135 meters
|
| gptkbp:length |
1820 meters
|
| gptkbp:locatedIn |
gptkb:Turkey
|
| gptkbp:locatedOnRiver |
gptkb:Tigris_River
|
| gptkbp:officialOpeningYear |
2020
|
| gptkbp:operator |
gptkb:State_Hydraulic_Works_(DSİ)
|
| gptkbp:partOf |
gptkb:Southeastern_Anatolia_Project_(GAP)
|
| gptkbp:purpose |
flood control
irrigation hydroelectric power generation |
| gptkbp:region |
gptkb:Southeastern_Anatolia
|
| gptkbp:reservoirCapacity |
10.4 billion cubic meters
|
| gptkbp:yearCompleted |
2018
|
| gptkbp:bfsParent |
gptkb:Hasankeyf_Bridge
gptkb:Zeynel_Bey_Mausoleum |
| gptkbp:bfsLayer |
8
|
| http://www.w3.org/2000/01/rdf-schema#label |
Ilısu Dam project
|