gptkbp:instance_of
|
gptkb:bridge
|
gptkbp:awards
|
multiple awards for design excellence
|
gptkbp:community_access
|
connects neighborhoods on both sides of the lake
|
gptkbp:community_engagement
|
public meetings held during planning
|
gptkbp:connects
|
gptkb:Seattle
gptkb:Mercer_Island
|
gptkbp:constructed_in
|
gptkb:1989
gptkb:Kiewit_Corporation
|
gptkbp:construction_cost
|
$1.4 billion
|
gptkbp:construction_material
|
reinforced concrete
|
gptkbp:construction_method
|
modular construction
|
gptkbp:construction_time
|
4 years
|
gptkbp:crosses
|
gptkb:Lake_Washington
|
gptkbp:cultural_significance
|
important for local transportation
|
gptkbp:design
|
gptkb:Washington_State_Department_of_Transportation
floating concrete pontoons
|
gptkbp:emergency_plan
|
evacuation routes established
|
gptkbp:emergency_services
|
available for emergency vehicles
|
gptkbp:environmental_impact
|
designed to minimize disruption to aquatic life
|
gptkbp:features
|
toll-free
|
gptkbp:flood_resistance
|
designed to handle flooding
|
gptkbp:future_plans
|
potential expansion considered
|
gptkbp:has_public_transport
|
bus routes available
sidewalks available
|
gptkbp:height
|
approximately 30 feet above the water
|
gptkbp:historical_significance
|
first floating bridge to be built in the U. S. with a concrete deck
|
https://www.w3.org/2000/01/rdf-schema#label
|
I-90 Floating Bridge
|
gptkbp:incident_response
|
quick response teams available
|
gptkbp:landmark
|
recognized as a regional landmark.
|
gptkbp:length
|
1.5 miles
|
gptkbp:lighting
|
LED lights for visibility
|
gptkbp:location
|
gptkb:Lake_Washington
|
gptkbp:maintenance
|
gptkb:Washington_State_Department_of_Transportation
regular inspections every 2 years
|
gptkbp:notable_for
|
being the longest floating bridge in the world
|
gptkbp:open_to_public
|
August 1993
|
gptkbp:opened
|
gptkb:1993
|
gptkbp:parking
|
bike lanes available
|
gptkbp:part_of
|
gptkb:Interstate_90
|
gptkbp:passenger_traffic
|
gptkb:vehicles
over 100,000 vehicles per day
real-time traffic updates available
|
gptkbp:project_manager
|
gptkb:Washington_State_Department_of_Transportation
|
gptkbp:renovation
|
gptkb:2016
|
gptkbp:safety_features
|
emergency lanes
|
gptkbp:scenic_views
|
gptkb:Lake_Washington
|
gptkbp:speed
|
60 mph
|
gptkbp:toll_status
|
no tolls
|
gptkbp:traffic_incident
|
frequent accidents due to weather conditions
|
gptkbp:traffic_signage
|
digital signs for traffic conditions
|
gptkbp:type
|
gptkb:bridge
|
gptkbp:uses
|
post-tensioned concrete
|
gptkbp:weather_resilience
|
designed to withstand storms
|
gptkbp:bfsParent
|
gptkb:Roebling's_Seattle_Bridge
|
gptkbp:bfsLayer
|
6
|