Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:wind
|
| gptkbp:annualProduction |
~135 GWh
|
| gptkbp:capacity |
30 MW
|
| gptkbp:CO2_savings_per_year |
~63,000 tonnes
|
| gptkbp:commissioned |
October 2017
|
| gptkbp:country |
gptkb:United_Kingdom
|
| gptkbp:distanceFromMainland |
25 km
|
| gptkbp:first_floating_wind_farm |
Yes
|
| gptkbp:foundation_type |
floating
|
| gptkbp:gridConnection |
gptkb:Peterhead_substation
|
| gptkbp:hasTower |
5
|
| gptkbp:locatedNear |
gptkb:Peterhead,_Aberdeenshire
|
| gptkbp:location |
gptkb:North_Sea
|
| gptkbp:maximumDepth |
95-120 metres
|
| gptkbp:operator |
gptkb:Equinor
|
| gptkbp:owner |
gptkb:Masdar
gptkb:Equinor |
| gptkbp:projectCost |
£210 million
|
| gptkbp:turbine_capacity |
6 MW
|
| gptkbp:turbineType |
gptkb:Siemens_SWT-6.0-154
|
| gptkbp:bfsParent |
gptkb:Equinor
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Hywind Scotland
|