Huanggang Yangtze River Bridge
GPTKB entity
Statements (59)
Predicate | Object |
---|---|
gptkbp:instanceOf |
bridge
|
gptkbp:built |
2015
4 years advanced engineering methods overcome successfully |
gptkbp:colors |
blue and white
|
gptkbp:community_engagement |
involved local stakeholders
|
gptkbp:connects |
Huanggang_and_Jiujiang
|
gptkbp:construction_cost |
approximately 1.5 billion yuan
|
gptkbp:constructionMaterial |
reinforced concrete
steel and concrete state-of-the-art |
gptkbp:constructionStarted |
government regulated
|
gptkbp:crosses |
gptkb:Yangtze_River
|
gptkbp:cultural_significance |
symbol of modern engineering
|
gptkbp:design |
gptkb:China_Road_and_Bridge_Corporation
sustainable engineering practices |
gptkbp:emergencyServices |
available
|
gptkbp:environmental_impact |
positive
minimal |
gptkbp:features |
pedestrian walkway
|
gptkbp:future_plans |
expansion possible
|
gptkbp:hasCharacter |
30 meters
200 meters regular inspections 1,700 meters cable-stayed wheelchair friendly high priority modern aesthetic |
gptkbp:height |
approximately 200 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
Huanggang Yangtze River Bridge
|
gptkbp:impact |
regional development
minimal disruption |
gptkbp:inspiration |
natural landscape
|
gptkbp:is_designed_to |
gptkb:Zhejiang_University
|
gptkbp:is_part_of |
G318 National Highway
|
gptkbp:isConnectedTo |
yes
|
gptkbp:length |
1,700 meters
|
gptkbp:lighting |
LED lights
|
gptkbp:location |
gptkb:Huanggang,_Hubei,_China
|
gptkbp:maintenance |
managed by local government
|
gptkbp:nearby_attractions |
yes
|
gptkbp:opened |
2019
|
gptkbp:passenger_traffic |
motor vehicles
installed 40,000 vehicles per day monitored 24/7 |
gptkbp:performances |
100 km/h
|
gptkbp:platforms |
available
|
gptkbp:productionCompany |
gptkb:China_Communications_Construction_Company
|
gptkbp:productLine |
1,080 meters
|
gptkbp:public_transport_access |
yes
|
gptkbp:sacraments |
attended by officials
|
gptkbp:safety_features |
high standards
|
gptkbp:significance |
improves regional connectivity
|
gptkbp:type |
cable-stayed bridge
|
gptkbp:vehicleClass |
installed
|
gptkbp:waterManagement |
designed for extreme conditions
|