High-Speed Rail Linking Three Airports

GPTKB entity

Statements (22)
Predicate Object
gptkbp:instanceOf gptkb:infrastructure
gptkb:train
gptkbp:connects gptkb:U-Tapao_International_Airport
Don Mueang International Airport
Suvarnabhumi Airport
gptkbp:country gptkb:Thailand
gptkbp:expectedCompletion 2029
https://www.w3.org/2000/01/rdf-schema#label High-Speed Rail Linking Three Airports
gptkbp:includesUpgradeOf existing Airport Rail Link
gptkbp:length 220 kilometers
gptkbp:mainContractor CP Group-led consortium
gptkbp:maximumSpeed 250 km/h
gptkbp:numberOfStations 9
gptkbp:operator gptkb:Eastern_High-Speed_Rail_Linking_Three_Airports_Co.,_Ltd.
gptkbp:partOf Eastern Economic Corridor (EEC)
gptkbp:projectCost 224 billion baht
gptkbp:purpose support economic development in EEC
improve connectivity between Bangkok and Eastern Thailand
gptkbp:route Bangkok – Chachoengsao – Chonburi – Si Racha – Pattaya – U-Tapao
gptkbp:status under construction
gptkbp:bfsParent gptkb:Airport_Rail_Link_(future)
gptkbp:bfsLayer 7