High-Speed Rail Linking Three Airports
GPTKB entity
Statements (22)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:infrastructure
gptkb:train |
| gptkbp:connects |
gptkb:U-Tapao_International_Airport
Don Mueang International Airport Suvarnabhumi Airport |
| gptkbp:country |
gptkb:Thailand
|
| gptkbp:expectedCompletion |
2029
|
| gptkbp:includesUpgradeOf |
existing Airport Rail Link
|
| gptkbp:length |
220 kilometers
|
| gptkbp:mainContractor |
CP Group-led consortium
|
| gptkbp:maximumSpeed |
250 km/h
|
| gptkbp:numberOfStations |
9
|
| gptkbp:operator |
gptkb:Eastern_High-Speed_Rail_Linking_Three_Airports_Co.,_Ltd.
|
| gptkbp:partOf |
Eastern Economic Corridor (EEC)
|
| gptkbp:projectCost |
224 billion baht
|
| gptkbp:purpose |
support economic development in EEC
improve connectivity between Bangkok and Eastern Thailand |
| gptkbp:route |
Bangkok – Chachoengsao – Chonburi – Si Racha – Pattaya – U-Tapao
|
| gptkbp:status |
under construction
|
| gptkbp:bfsParent |
gptkb:Airport_Rail_Link_(future)
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
High-Speed Rail Linking Three Airports
|