Properties (56)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Type 26 frigate
|
gptkbp:aircraft |
Helicopter capable
|
gptkbp:armament |
Artillery, missiles, torpedoes
|
gptkbp:beam |
20.8 meters
|
gptkbp:builder |
gptkb:Bae_Systems
|
gptkbp:class |
City-class
|
gptkbp:commissioningDate |
2025
|
gptkbp:communityEngagement |
Local outreach programs
|
gptkbp:contractUntil |
2017
|
gptkbp:crew |
118 personnel
|
gptkbp:decommissioningDate |
TBD
|
gptkbp:design |
Stealth technology
Bae_Systems_and_UK_Ministry_of_Defence |
gptkbp:displacement |
6,900 tons
|
gptkbp:electronic_warfare |
Electronic countermeasures
|
gptkbp:environmentalImpact |
Designed for reduced emissions
|
gptkbp:firstMatch |
No
|
gptkbp:futurePlans |
Budget constraints
Modular design for upgrades Global deployment |
gptkbp:historicalSignificance |
Modern naval warfare capabilities
|
gptkbp:homePort |
gptkb:Portsmouth
|
https://www.w3.org/2000/01/rdf-schema#label |
HMS Glasgow (Type 26)
|
gptkbp:integration |
Joint operations with allies
|
gptkbp:internationalCooperation |
NATO_partners
|
gptkbp:is_expected_to |
2025
|
gptkbp:launchDate |
2022-07-30
|
gptkbp:launchSite |
Glasgow,_Scotland
|
gptkbp:leads |
No
|
gptkbp:length |
149.9 meters
|
gptkbp:maxSpeed |
26 knots
|
gptkbp:mediaCoverage |
Defense publications
|
gptkbp:militaryRank |
Surface and air threats
|
gptkbp:missionCapabilities |
Multi-role operations
|
gptkbp:navalFleet |
gptkb:Royal_Navy
|
gptkbp:notable_player |
Phalanx CIWS
|
gptkbp:operationalRange |
7,000 nautical miles
|
gptkbp:operationalStatus |
In development
|
gptkbp:partnerships |
Defense contractors
|
gptkbp:partOf |
Royal_Navy_fleet
|
gptkbp:primaryMission |
Maritime security
|
gptkbp:project |
1 billion GBP
|
gptkbp:propulsion |
Gas turbine and diesel engines
|
gptkbp:publicAccess |
Public tours and events
|
gptkbp:researchAndDevelopment |
Innovative naval technologies
|
gptkbp:role |
Anti-submarine warfare
|
gptkbp:secondaryMission |
Humanitarian assistance
|
gptkbp:sensors |
Radar,_sonar_systems
|
gptkbp:sisterShip |
gptkb:HMS_Cardiff_(Type_26)
|
gptkbp:status |
Under construction
|
gptkbp:strategicGoals |
National defense
|
gptkbp:supportRole |
Logistics and supply missions
COTS-based system Naval training operations |
gptkbp:surveillanceEquipment |
Advanced surveillance systems
|
gptkbp:sustainability |
Energy-efficient systems
|