George Massey Tunnel Replacement Project
GPTKB entity
Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:infrastructure
|
| gptkbp:announced |
gptkb:Government_of_British_Columbia
|
| gptkbp:connects |
gptkb:Richmond
Delta |
| gptkbp:country |
gptkb:Canada
|
| gptkbp:crosses |
gptkb:Fraser_River
|
| gptkbp:environmentalImpact |
required
|
| gptkbp:expectedCompletion |
2030s
|
| gptkbp:includes |
dedicated transit lanes
cycling and pedestrian pathways |
| gptkbp:location |
gptkb:British_Columbia
|
| gptkbp:notableProject |
gptkb:infrastructure
|
| gptkbp:originalTunnelOpened |
1959
|
| gptkbp:plannedStructure |
immersed tube tunnel
|
| gptkbp:previousProposal |
10-lane bridge (cancelled)
|
| gptkbp:projectCost |
over $4 billion
|
| gptkbp:publicConsultation |
ongoing
|
| gptkbp:purpose |
replace George Massey Tunnel
|
| gptkbp:replacedBy |
gptkb:George_Massey_Tunnel
|
| gptkbp:status |
in planning
|
| gptkbp:bfsParent |
gptkb:Deas_Island_Tunnel
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
George Massey Tunnel Replacement Project
|