Eurasia Tunnel Project

GPTKB entity

Statements (16)
Predicate Object
gptkbp:instance_of gptkb:infrastructure
gptkbp:benefits reduces traffic congestion
gptkbp:connects European and Asian sides of Istanbul
gptkbp:construction_started gptkb:2011
gptkbp:depth approximately 106 meters below sea level
gptkbp:features two lanes in each direction
https://www.w3.org/2000/01/rdf-schema#label Eurasia Tunnel Project
gptkbp:length 14.6 kilometers
gptkbp:location gptkb:Istanbul,_Turkey
gptkbp:opened December 20, 2016
gptkbp:operator gptkb:Istanbul_Metropolitan_Municipality
gptkbp:price approximately $1.2 billion
gptkbp:type gptkb:cave
gptkbp:uses_technology TBM (Tunnel Boring Machine)
gptkbp:bfsParent gptkb:Bosphorus_Strait_Bridge
gptkbp:bfsLayer 6