Statements (16)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:infrastructure
|
gptkbp:benefits |
reduces traffic congestion
|
gptkbp:connects |
European and Asian sides of Istanbul
|
gptkbp:construction_started |
gptkb:2011
|
gptkbp:depth |
approximately 106 meters below sea level
|
gptkbp:features |
two lanes in each direction
|
https://www.w3.org/2000/01/rdf-schema#label |
Eurasia Tunnel Project
|
gptkbp:length |
14.6 kilometers
|
gptkbp:location |
gptkb:Istanbul,_Turkey
|
gptkbp:opened |
December 20, 2016
|
gptkbp:operator |
gptkb:Istanbul_Metropolitan_Municipality
|
gptkbp:price |
approximately $1.2 billion
|
gptkbp:type |
gptkb:cave
|
gptkbp:uses_technology |
TBM (Tunnel Boring Machine)
|
gptkbp:bfsParent |
gptkb:Bosphorus_Strait_Bridge
|
gptkbp:bfsLayer |
6
|