Statements (17)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:proposed_railway_line
|
| gptkbp:announced |
2010s
|
| gptkbp:country |
gptkb:Turkey
|
| gptkbp:endPoint |
gptkb:Trabzon
|
| gptkbp:expectedCompletion |
TBD
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:length |
approximately 200 km (planned)
|
| gptkbp:notableFeature |
includes long tunnels through Pontic Mountains
|
| gptkbp:operator |
gptkb:TCDD_(planned)
|
| gptkbp:purpose |
connect Black Sea region to Eastern Anatolia
|
| gptkbp:regionServed |
gptkb:Black_Sea_region
gptkb:Eastern_Anatolia |
| gptkbp:startPoint |
gptkb:Erzincan
|
| gptkbp:status |
proposed
|
| gptkbp:bfsParent |
gptkb:Gümüşhane_Station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Erzincan–Trabzon railway
|