Statements (55)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:Team_Rocket
|
gptkbp:challenges |
overcome during development
|
gptkbp:collaboration |
limited
|
gptkbp:control_system |
gptkb:navigation_system
|
gptkbp:debut |
2018-01-14
ongoing since 2018 |
gptkbp:design_purpose |
cost-effective satellite launches
|
gptkbp:development |
gptkb:2013
Interstellar Technologies engineers |
gptkbp:development_cost |
approximately $30 million
|
gptkbp:diameter |
2.5 meters
|
gptkbp:durability |
not reusable
|
gptkbp:engine_type |
gptkb:Team_Rocket
|
gptkbp:environmental_impact |
assessed during development
|
gptkbp:fuel_type |
kerosene and liquid oxygen
|
gptkbp:future_plans |
expand launch capabilities
|
gptkbp:guidance_system |
GPS-based guidance
|
gptkbp:height |
26 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
Epsilon 1
|
gptkbp:launch_date |
2018-01-14
up to 4 times a year |
gptkbp:launch_event |
achieved on first attempt
|
gptkbp:launch_platform |
gptkb:Interstellar_Technologies
conducted by mission team |
gptkbp:launch_price |
$10 million
|
gptkbp:launch_site |
Taiki, Hokkaido, Japan
|
gptkbp:launch_vehicle |
gptkb:Epsilon
expendable launch vehicle single configuration small-lift launch vehicle |
gptkbp:launch_window |
varies by mission
|
gptkbp:launched |
gptkb:3
approximately 6 months |
gptkbp:manufacturer |
gptkb:Interstellar_Technologies
|
gptkbp:media_coverage |
significant during launches
|
gptkbp:mission |
Interstellar Technologies headquarters
successful payload deployment |
gptkbp:notable_launches |
RAPIS 1
|
gptkbp:number_of_stages |
gptkb:3
gptkb:LE-5_B solid rocket motor LE-5 |
gptkbp:operational_status |
active
|
gptkbp:operational_use |
commercial satellite deployment
|
gptkbp:partnerships |
with local universities
|
gptkbp:payload_capacity |
2.5 meters in diameter
performed at launch site 150 kg to low Earth orbit |
gptkbp:propulsion |
300 k N
|
gptkbp:public_interest |
growing in Japan
|
gptkbp:purpose |
gptkb:Space_Launch_System
|
gptkbp:safety_record |
no incidents reported
|
gptkbp:success_rate |
100% after first launch
|
gptkbp:target_market |
small satellite operators
|
gptkbp:upgrades |
planned for increased payload capacity
|