Statements (21)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:electricity_interconnector
|
| gptkbp:capacity |
1000 MW
|
| gptkbp:commissioned |
2022
|
| gptkbp:constructionStartYear |
2017
|
| gptkbp:country |
gptkb:France
gptkb:United_Kingdom |
| gptkbp:endPoint |
gptkb:Coquelles,_France
|
| gptkbp:length |
51 km
|
| gptkbp:location |
gptkb:Channel_Tunnel
|
| gptkbp:operatingSystem |
±320 kV
|
| gptkbp:operator |
gptkb:ElecLink_Limited
|
| gptkbp:owner |
gptkb:Getlink
|
| gptkbp:purpose |
electricity transmission
|
| gptkbp:route |
through Channel Tunnel
|
| gptkbp:startPoint |
gptkb:Folkestone,_United_Kingdom
|
| gptkbp:status |
operational
|
| gptkbp:type |
gptkb:HVDC
|
| gptkbp:website |
https://www.eleclink.co.uk/
|
| gptkbp:bfsParent |
gptkb:Getlink
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
ElecLink
|