Downtown Seattle Transit Tunnel (historical)
GPTKB entity
Statements (22)
Predicate | Object |
---|---|
gptkbp:instanceOf |
transit tunnel
|
gptkbp:built |
1987–1990
|
gptkbp:closed |
March 23, 2019
|
gptkbp:convertedTo |
light rail only
|
gptkbp:historicalName |
no longer used for buses after 2019
|
https://www.w3.org/2000/01/rdf-schema#label |
Downtown Seattle Transit Tunnel (historical)
|
gptkbp:laterOperator |
gptkb:Sound_Transit
|
gptkbp:length |
1.3 miles
|
gptkbp:location |
gptkb:Seattle,_Washington,_United_States
|
gptkbp:opened |
September 15, 1990
|
gptkbp:operatedBy |
King County Metro
|
gptkbp:ownedBy |
gptkb:Sound_Transit
|
gptkbp:partOf |
gptkb:Link_light_rail_system
|
gptkbp:purpose |
reduce surface congestion
|
gptkbp:serves |
gptkb:railway_station
buses |
gptkbp:station |
gptkb:Pioneer_Square_Station
gptkb:International_District/Chinatown_Station gptkb:Westlake_Station gptkb:University_Street_Station |
gptkbp:bfsParent |
gptkb:King_County_Metro_bus
|
gptkbp:bfsLayer |
7
|