Statements (13)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:Electrical_substation
|
| gptkbp:commissioned |
2014
|
| gptkbp:connectedTo |
Chamouchouane–Bout-de-l’Île transmission line
|
| gptkbp:country |
gptkb:Canada
|
| gptkbp:location |
Val-Joli, Quebec, Canada
|
| gptkbp:operatedBy |
gptkb:Hydro-Québec
|
| gptkbp:operatingSystem |
735 kV
|
| gptkbp:ownedBy |
gptkb:Hydro-Québec
|
| gptkbp:province |
gptkb:Quebec
|
| gptkbp:purpose |
Electric power transmission
|
| gptkbp:bfsParent |
gptkb:Quebec_Interconnection
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Des Cantons Substation
|