Datong–Puzhou Railway

GPTKB entity

Properties (49)
Predicate Object
gptkbp:instanceOf railway
gptkbp:challenges environmental regulations
funding issues
construction delays
land acquisition disputes
public opposition to routes
gptkbp:connects gptkb:Datong
Puzhou
gptkbp:constructionMaterial estimated at 10 billion yuan
gptkbp:constructionStarted 2001
gptkbp:culturalImpact supports local businesses
facilitates cultural exchange
enhances tourism opportunities
promotes regional heritage
increases accessibility to cultural sites
gptkbp:electrification Yes
gptkbp:environmentalImpact noise reduction technologies
reduced carbon emissions
wildlife protection measures
promotes sustainable transport
minimized land disruption
gptkbp:futurePlans expansion to other cities
increased service frequency
upgrades to infrastructure
integration with other transport modes
introduction of new rolling stock
https://www.w3.org/2000/01/rdf-schema#label Datong–Puzhou Railway
gptkbp:length approximately 200 km
gptkbp:location gptkb:China
gptkbp:maxSpeed 250 km/h
gptkbp:opened 2005
gptkbp:operatedBy gptkb:China_Railway
gptkbp:partOf gptkb:Chinese_railway_network
gptkbp:railwayLine gptkb:Datong–Puzhou_Line
gptkbp:safetyFeatures staff training programs
emergency response protocols
modern signaling systems
regular maintenance schedules
advanced train control systems
gptkbp:serves freight transport
passenger transport
gptkbp:significance reduces travel time
improves regional connectivity
promotes economic development
enhances freight capacity
gptkbp:stations gptkb:Datong_Station
gptkb:Puzhou_Station
gptkbp:track 1,435 mm (standard gauge)
gptkbp:type high-speed railway