Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connectsCity |
gptkb:Baoshan
gptkb:Dali gptkb:Ruili |
| gptkbp:constructionStartYear |
2008
|
| gptkbp:country |
gptkb:China
|
| gptkbp:endPoint |
gptkb:Ruili
|
| gptkbp:expansion |
gptkb:Myanmar_border
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:length |
approximately 330 km
|
| gptkbp:locatedIn |
gptkb:Yunnan_Province
|
| gptkbp:notableBattle |
gptkb:Gaoligongshan_Tunnel
|
| gptkbp:notableBuilding |
gptkb:Gaoligongshan_Tunnel
gptkb:Nujiang_Bridge |
| gptkbp:openedPartially |
2022
|
| gptkbp:operator |
gptkb:China_Railway
|
| gptkbp:partOf |
China–Myanmar railway corridor
|
| gptkbp:purpose |
passenger and freight transport
|
| gptkbp:startPoint |
gptkb:Dali
|
| gptkbp:status |
partially operational
|
| gptkbp:bfsParent |
gptkb:Nujiang_Bridge
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Dali–Ruili Railway
|