Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:capacity |
88 seated
150 standing |
| gptkbp:countryOfOperation |
gptkb:United_Kingdom
|
| gptkbp:depot |
gptkb:Nunnery_Square_Depot
|
| gptkbp:family |
gptkb:Stadler_Citylink
|
| gptkbp:fleetSize |
399201–399207
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:height |
3.6 m
|
| gptkbp:introduced |
2017
|
| gptkbp:length |
37.2 m
|
| gptkbp:manufacturer |
gptkb:Stadler_Rail
|
| gptkbp:maximumSpeed |
100 km/h
|
| gptkbp:numberBuilt |
7
|
| gptkbp:numberOfDoors |
6 per side
|
| gptkbp:operator |
gptkb:Northern_Trains
gptkb:Stagecoach_Supertram |
| gptkbp:powerSource |
750 V DC overhead
|
| gptkbp:purpose |
tram-train pilot project
|
| gptkbp:UICClassification |
Bo′2′Bo′
|
| gptkbp:usedOn |
gptkb:Sheffield–Rotherham_tram-train_route
gptkb:Sheffield_Supertram_network |
| gptkbp:weight |
66 t
|
| gptkbp:width |
2.65 m
|
| gptkbp:bfsParent |
gptkb:Sheffield_Supertram
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Class 399 Citylink
|