Chongqing East Railway Station
GPTKB entity
Statements (60)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway station
|
gptkbp:accessibility |
Wheelchair accessible
|
gptkbp:addresses |
gptkb:Yubei_District,_Chongqing
|
gptkbp:annualRidership |
over 10 million
|
gptkbp:architect |
nan
|
gptkbp:architecturalStyle |
Modern
|
gptkbp:area |
100,000 square meters
|
gptkbp:built |
2008
2011 |
gptkbp:busConnections |
Yes
|
gptkbp:code |
CQE
|
gptkbp:connects |
gptkb:Metro_Line_3
|
gptkbp:construction_cost |
1.5 billion yuan
|
gptkbp:design |
Contemporary architecture
|
gptkbp:elevation |
400 meters above sea level
|
gptkbp:facilities |
Restaurants
Ticket office Shops Waiting hall |
gptkbp:futurePlans |
Planned
|
https://www.w3.org/2000/01/rdf-schema#label |
Chongqing East Railway Station
|
gptkbp:locatedIn |
gptkb:Chongqing
|
gptkbp:locationType |
Urban
|
gptkbp:opened |
2011
|
gptkbp:operator |
gptkb:China_Railway
|
gptkbp:parking |
Available
|
gptkbp:platforms |
12
|
gptkbp:railwayLine |
gptkb:Chengdu–Chongqing_railway
Chongqing–Beijing_railway Chongqing–Guangzhou_railway Chongqing–Guizhou_railway Chongqing–Hangzhou_railway Chongqing–Hefei_railway Chongqing–Huanggang_railway Chongqing–Lanzhou_railway Chongqing–Lijiang_railway Chongqing–Nanchang_railway Chongqing–Nanchong_railway Chongqing–Nanning_railway Chongqing–Ningbo_railway Chongqing–Shanghai_railway Chongqing–Shenzhen_railway Chongqing–Taiyuan_railway Chongqing–Wanzhou_railway Chongqing–Wuhan_railway Chongqing–Xiamen_railway Chongqing–Xiangyang_railway Chongqing–Zhengzhou_railway Chongqing–Zunyi_railway Yuxi–Chongqing_railway |
gptkbp:renovated |
nan
|
gptkbp:security |
CCTV surveillance
|
gptkbp:serves |
gptkb:Chongqing
|
gptkbp:services |
D trains
G trains K trains T trains |
gptkbp:sustainability_initiatives |
Energy-efficient systems
|
gptkbp:trainServices |
High-speed trains
|
gptkbp:type |
High-speed railway station
|