Statements (65)
Predicate | Object |
---|---|
gptkbp:instanceOf |
flood barrier
|
gptkbp:associatedWith |
flood management
|
gptkbp:built |
2005
completed on schedule |
gptkbp:climate |
improves infrastructure
|
gptkbp:collaboratesWith |
local agencies
|
gptkbp:communityEngagement |
public meetings
|
gptkbp:communityFeedback |
considered in planning
|
gptkbp:communityImpact |
enhanced property values
|
gptkbp:communityPartnerships |
collaborative efforts
|
gptkbp:communityPrograms |
increased safety
|
gptkbp:communitySupport |
strong advocacy
|
gptkbp:constructionMaterial |
steel and concrete
|
gptkbp:controls |
gptkb:Charles_River
|
gptkbp:design |
automated operation
national guidelines |
gptkbp:designedBy |
gptkb:Army_Corps_of_Engineers
contractors |
gptkbp:electronicSystems |
site-specific conditions
|
gptkbp:emergencyServices |
flood events
conducted annually established procedures integrated with local services |
gptkbp:environmentalImpact |
minimal
|
gptkbp:features |
gates
|
gptkbp:futurePlans |
climate variability
upgrades and expansions |
gptkbp:gameMechanics |
innovative solutions
|
gptkbp:hasFunding |
grants and donations
|
gptkbp:height |
manual and automated
up to 12 feet |
gptkbp:historicalContext |
developed after major floods
|
gptkbp:historicalSignificance |
protects historical sites
|
https://www.w3.org/2000/01/rdf-schema#label |
Charles River Flood Barrier
|
gptkbp:impact |
reduces flood risk
|
gptkbp:is_funded_by |
federal and state funds
|
gptkbp:is_monitored_by |
real-time data
|
gptkbp:length |
approximately 1,000 feet
|
gptkbp:lighting |
significant events documented
|
gptkbp:localEconomy |
positively impacted
|
gptkbp:location |
gptkb:Cambridge,_Massachusetts
|
gptkbp:maintenance |
regular inspections
|
gptkbp:mediaCoverage |
local news outlets
|
gptkbp:opened |
2005
|
gptkbp:operatedBy |
gptkb:Massachusetts_Department_of_Conservation_and_Recreation
|
gptkbp:operationalStatus |
active
|
gptkbp:partnerships |
non-profit organizations
|
gptkbp:partOf |
flood control system
|
gptkbp:project |
several years
state budget allocations reduce flood damage efficient oversight |
gptkbp:protectedArea |
urban areas
|
gptkbp:publicAccess |
educational programs
limited enhanced through infrastructure |
gptkbp:purpose |
flood protection
|
gptkbp:regulatoryCompliance |
environmental regulations
|
gptkbp:relatedTo |
climate change adaptation
|
gptkbp:riskManagement |
conducted regularly
|
gptkbp:serves |
Boston_metropolitan_area
|
gptkbp:stakeholders |
local residents
|
gptkbp:sustainabilityPractices |
eco-friendly materials
|
gptkbp:type |
movable barrier
|
gptkbp:zone |
designated areas
|