Chacao Channel Bridge (under construction)
GPTKB entity
Statements (19)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:bridge
|
| gptkbp:bridgeType |
gptkb:bridge
|
| gptkbp:connects |
gptkb:mainland_Chile
gptkb:ChiloƩ_Island |
| gptkbp:crosses |
gptkb:Chacao_Channel
|
| gptkbp:designer |
gptkb:COWI
|
| gptkbp:expectedCompletion |
2025
|
| gptkbp:hasTower |
3
|
| gptkbp:locatedIn |
gptkb:Chile
|
| gptkbp:mainContractor |
gptkb:Hyundai_Engineering_&_Construction
|
| gptkbp:mainSpan |
1,055 meters
|
| gptkbp:numberOfLanes |
2
|
| gptkbp:owner |
gptkb:Government_of_Chile
|
| gptkbp:plannedLength |
2,750 meters
|
| gptkbp:region |
gptkb:Los_Lagos_Region
|
| gptkbp:status |
under construction
|
| gptkbp:bfsParent |
gptkb:Chacao_Channel
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Chacao Channel Bridge (under construction)
|