Canakkale 1915 Bridge Project
GPTKB entity
Statements (67)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:bridge
|
gptkbp:academic_programs |
Turkish engineers
|
gptkbp:associated_with |
Çanakkale Strait
|
gptkbp:audience |
positive
|
gptkbp:awards |
multiple engineering awards
|
gptkbp:benefits |
reduces travel time between continents
|
gptkbp:bridge_accessibility |
improved for pedestrians and cyclists
|
gptkbp:bridge_construction |
completed ahead of schedule
|
gptkbp:bridge_economic_impact |
estimated $1 billion annually
|
gptkbp:bridge_environmental_assessment |
conducted prior to construction
|
gptkbp:bridge_foundation |
deep pile foundations
|
gptkbp:bridge_lighting |
LED lighting system
|
gptkbp:bridge_opening_ceremony |
attended by government officials
|
gptkbp:bridge_security |
CCTV surveillance system
|
gptkbp:bridge_signage |
multilingual signage installed
|
gptkbp:challenges |
weather conditions
strong winds |
gptkbp:collaboration |
international engineering firms
|
gptkbp:community_engagement |
local community consultations held
|
gptkbp:community_impact |
job creation
|
gptkbp:construction_cost |
$2.5 billion
|
gptkbp:construction_material |
high-strength steel
|
gptkbp:construction_method |
incremental launching
|
gptkbp:construction_started |
gptkb:2017
|
gptkbp:cultural_events |
planned cultural events at the site
|
gptkbp:cultural_significance |
symbol of modern Turkey
|
gptkbp:design |
gptkb:Kolin_Construction
Makyol |
gptkbp:design_features |
aesthetic lighting
|
gptkbp:designed_by |
Yavuz Sultan Selim Bridge team
|
gptkbp:environmental_impact |
minimal
|
gptkbp:events |
March 18, 2022
|
gptkbp:funding |
gptkb:Partnerships
|
gptkbp:height |
318 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
Canakkale 1915 Bridge Project
|
gptkbp:innovation |
advanced construction techniques
|
gptkbp:international_relations |
strengthened
|
gptkbp:is_funded_by |
gptkb:Turkish_government
|
gptkbp:length |
2023 meters
|
gptkbp:local_economy |
boosted
|
gptkbp:location |
gptkb:Canakkale,_Turkey
|
gptkbp:maintenance |
regular inspections
|
gptkbp:opened |
March 18, 2022
|
gptkbp:part_of |
gptkb:North_Marmara_Highway
|
gptkbp:passenger_traffic |
improved
intelligent traffic systems significant reduction in congestion 45,000 vehicles per day |
gptkbp:project |
2017-2022
5 years connect major cities efficient project management team |
gptkbp:purpose |
connect Europe and Asia
|
gptkbp:safety_features |
earthquake resistance
|
gptkbp:significance |
longest suspension bridge in the world at completion
|
gptkbp:tourism_impact |
increased tourism
|
gptkbp:type |
gptkb:bridge
|
gptkbp:wing_configuration |
45 meters
cable-stayed bridge modern architectural design 2023 meters 318 meters above sea level planned for every 5 years |
gptkbp:year |
gptkb:2022
|
gptkbp:bfsParent |
gptkb:Çanakkale_Bridge
gptkb:Canakkale_1915_Bridge |
gptkbp:bfsLayer |
6
|