Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:subsea_power_cable
|
| gptkbp:capacity |
1200 MW
|
| gptkbp:commissioned |
2018
|
| gptkbp:connects |
gptkb:Caithness
gptkb:Moray |
| gptkbp:constructionStartYear |
2015
|
| gptkbp:cost |
£1.1 billion
|
| gptkbp:landfallLocation |
gptkb:Portgordon
Noss Head |
| gptkbp:length |
160 km
|
| gptkbp:locatedIn |
gptkb:Scotland
|
| gptkbp:operatedBy |
Scottish and Southern Electricity Networks
|
| gptkbp:operatingSystem |
320 kV
|
| gptkbp:purpose |
transmit renewable energy from north of Scotland to south
|
| gptkbp:type |
gptkb:HVDC
|
| gptkbp:bfsParent |
gptkb:Peterhead_substation
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Caithness–Moray Link
|