Statements (18)
Predicate | Object |
---|---|
gptkbp:instanceOf |
subsea power cable
|
gptkbp:capacity |
1200 MW
|
gptkbp:commissioned |
2018
|
gptkbp:connects |
gptkb:Caithness
gptkb:Moray |
gptkbp:constructionStartYear |
2015
|
gptkbp:cost |
£1.1 billion
|
https://www.w3.org/2000/01/rdf-schema#label |
Caithness–Moray Link
|
gptkbp:landfallLocation |
gptkb:Portgordon
Noss Head |
gptkbp:length |
160 km
|
gptkbp:locatedIn |
gptkb:Scotland
|
gptkbp:operatedBy |
Scottish and Southern Electricity Networks
|
gptkbp:operatingSystem |
320 kV
|
gptkbp:purpose |
transmit renewable energy from north of Scotland to south
|
gptkbp:type |
gptkb:HVDC
|
gptkbp:bfsParent |
gptkb:Peterhead_substation
|
gptkbp:bfsLayer |
8
|