Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:bridge
|
| gptkbp:carries |
road traffic
|
| gptkbp:connects |
gptkb:Tulcea_County
gptkb:Braila_County |
| gptkbp:crosses |
gptkb:Danube_River
|
| gptkbp:designer |
gptkb:Astaldi
IHI Infrastructure Systems |
| gptkbp:length |
1974 meters
|
| gptkbp:location |
gptkb:Romania
|
| gptkbp:mainContractor |
gptkb:Astaldi
IHI Infrastructure Systems |
| gptkbp:mainSpan |
1120 meters
|
| gptkbp:nearestCity |
gptkb:Braila
Smardan |
| gptkbp:number_of_pedestrian_lanes |
2
|
| gptkbp:numberOfLanes |
4
|
| gptkbp:opened |
2023
|
| gptkbp:owner |
gptkb:Romanian_government
|
| gptkbp:projectCost |
approximately €500 million
|
| gptkbp:purpose |
improve connectivity between Dobrogea and the rest of Romania
|
| gptkbp:rank |
longest bridge in Romania
third longest suspension bridge in the European Union |
| gptkbp:toll |
no
|
| gptkbp:type |
gptkb:bridge
|
| gptkbp:bfsParent |
gptkb:Great_Braila_Island
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Braila Bridge
|