Statements (27)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:bridge
|
gptkbp:carries |
road traffic
|
gptkbp:connects |
gptkb:Tulcea_County
gptkb:Braila_County |
gptkbp:crosses |
gptkb:Danube_River
|
gptkbp:designer |
gptkb:Astaldi
IHI Infrastructure Systems |
https://www.w3.org/2000/01/rdf-schema#label |
Braila Bridge
|
gptkbp:length |
1974 meters
|
gptkbp:location |
gptkb:Romania
|
gptkbp:mainContractor |
gptkb:Astaldi
IHI Infrastructure Systems |
gptkbp:mainSpan |
1120 meters
|
gptkbp:nearestCity |
gptkb:Braila
Smardan |
gptkbp:number_of_pedestrian_lanes |
2
|
gptkbp:numberOfLanes |
4
|
gptkbp:opened |
2023
|
gptkbp:owner |
gptkb:Romanian_government
|
gptkbp:projectCost |
approximately €500 million
|
gptkbp:purpose |
improve connectivity between Dobrogea and the rest of Romania
|
gptkbp:rank |
longest bridge in Romania
third longest suspension bridge in the European Union |
gptkbp:toll |
no
|
gptkbp:type |
gptkb:bridge
|
gptkbp:bfsParent |
gptkb:Great_Braila_Island
|
gptkbp:bfsLayer |
7
|