Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
concentrated solar power plant
|
gptkbp:capacity |
50 MW
|
gptkbp:commissioned |
2016
|
gptkbp:country |
gptkb:South_Africa
|
gptkbp:gridConnection |
gptkb:Eskom_grid
|
https://www.w3.org/2000/01/rdf-schema#label |
Bokpoort CSP
|
gptkbp:latitude |
-29.282
|
gptkbp:location |
gptkb:Northern_Cape,_South_Africa
|
gptkbp:longitude |
21.049
|
gptkbp:operator |
gptkb:ACWA_Power
|
gptkbp:owner |
gptkb:ACWA_Power
|
gptkbp:projectCost |
ZAR 5 billion
|
gptkbp:renewableEnergyIndependentPowerProducerProcurementProgramme |
Bid Window 1
|
gptkbp:status |
operational
|
gptkbp:technology |
parabolic trough
|
gptkbp:thermalStorageCapacity |
9.3 hours
|
gptkbp:thermalStorageMedium |
molten salt
|
gptkbp:website |
https://www.acwapower.com/en/projects/bokpoort-csp/
|
gptkbp:bfsParent |
gptkb:ACWA_Power
|
gptkbp:bfsLayer |
7
|