Statements (27)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:bridge
|
gptkbp:city |
gptkb:Manila
|
gptkbp:connects |
gptkb:Binondo
gptkb:Intramuros |
gptkbp:constructionStartYear |
July 2018
|
gptkbp:country |
gptkb:Philippines
|
gptkbp:crosses |
gptkb:Pasig_River
|
gptkbp:designer |
basket-handle tied-arch bridge
|
gptkbp:engineer |
gptkb:China_Road_and_Bridge_Corporation
|
gptkbp:fundedBy |
gptkb:People's_Republic_of_China
|
gptkbp:hasBicycleFacilities |
yes
|
https://www.w3.org/2000/01/rdf-schema#label |
Binondo–Intramuros Bridge
|
gptkbp:length |
680 meters
|
gptkbp:location |
gptkb:Manila
|
gptkbp:maintainedBy |
gptkb:Department_of_Public_Works_and_Highways
|
gptkbp:material |
gptkb:steel
concrete |
gptkbp:numberOfLanes |
4
|
gptkbp:officialName |
gptkb:Binondo–Intramuros_Bridge
|
gptkbp:opened |
April 5, 2022
|
gptkbp:partOf |
gptkb:Metro_Manila_road_network
|
gptkbp:projectCost |
3.39 billion Philippine pesos
|
gptkbp:replacedBy |
temporary Mabini Bridge
|
gptkbp:toll |
no
|
gptkbp:width |
21.65 meters
|
gptkbp:bfsParent |
gptkb:Binondo-Intramuros_Bridge
|
gptkbp:bfsLayer |
7
|