Statements (29)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:bridge
|
| gptkbp:carries |
gptkb:East_Coast_Parkway
|
| gptkbp:connects |
gptkb:East_Coast
gptkb:Kallang gptkb:Marina_South |
| gptkbp:constructionStartYear |
1977
|
| gptkbp:cost |
S$110 million
|
| gptkbp:crosses |
gptkb:Kallang_Basin
gptkb:Marina_Bay |
| gptkbp:featuredIn |
Singapore Marathon route
|
| gptkbp:highestPoint |
20 m
|
| gptkbp:length |
1.8 km
|
| gptkbp:location |
gptkb:Singapore
|
| gptkbp:maintainedBy |
gptkb:Land_Transport_Authority
|
| gptkbp:material |
pre-stressed concrete
|
| gptkbp:namedAfter |
gptkb:Benjamin_Sheares
|
| gptkbp:notableFor |
longest bridge in Singapore (as of 2024)
|
| gptkbp:opened |
gptkb:Ong_Teng_Cheong
1981 |
| gptkbp:partOf |
gptkb:East_Coast_Parkway
|
| gptkbp:usedFor |
cycling
pedestrian traffic vehicular traffic |
| gptkbp:bfsParent |
gptkb:Benjamin_Sheares
gptkb:Marina_Bay,_Singapore gptkb:Marina_Channel gptkb:Singapore_River,_Singapore |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Benjamin Sheares Bridge
|