Beijing–Shanghai High-Speed Railway corridor
GPTKB entity
Statements (12)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway line
|
gptkbp:constructionMaterial |
$33 billion
|
https://www.w3.org/2000/01/rdf-schema#label |
Beijing–Shanghai High-Speed Railway corridor
|
gptkbp:length |
1318 kilometers
|
gptkbp:maxSpeed |
350 km/h
|
gptkbp:numberOfStations |
24
|
gptkbp:opened |
June 30, 2011
|
gptkbp:operatesIn |
gptkb:Beijing
gptkb:Shanghai |
gptkbp:operator |
gptkb:China_Railway_Corporation
|
gptkbp:significance |
first high-speed railway in China
|
gptkbp:travelTime |
approximately 4.5 hours
|