Statements (18)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Mass Rapid Transit depot
|
gptkbp:address |
Bedok South Road, Singapore
|
gptkbp:capacity |
up to 570 trains
|
gptkbp:country |
gptkb:Singapore
|
gptkbp:features |
maintenance facilities
operations control centre stabling tracks |
https://www.w3.org/2000/01/rdf-schema#label |
Bedok South Depot
|
gptkbp:location |
gptkb:Bedok,_Singapore
|
gptkbp:opened |
2025 (expected)
|
gptkbp:operator |
gptkb:SMRT_Trains
|
gptkbp:owner |
gptkb:Land_Transport_Authority
|
gptkbp:partOf |
Singapore MRT network
|
gptkbp:servesLine |
gptkb:Thomson–East_Coast_Line
|
gptkbp:structureType |
At-grade
|
gptkbp:bfsParent |
gptkb:Singapore_Mass_Rapid_Transit_(SMRT)
gptkb:Singapore_railway_network |
gptkbp:bfsLayer |
8
|