Statements (25)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:bridge
|
gptkbp:architectural_style |
modern
|
gptkbp:connects |
Banjul and the mainland
|
gptkbp:construction_cost |
$30 million
|
gptkbp:construction_started |
gptkb:1994
gptkb:1997 |
gptkbp:coordinates |
13.4531° N, 16.5783° W
|
gptkbp:crosses |
Gambia River
|
gptkbp:designed_by |
Sogreah Engineering
|
gptkbp:features |
gptkb:pedestrian_walkway
|
gptkbp:height |
40 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
Banjul Bridge
|
gptkbp:length |
1,060 meters
|
gptkbp:location |
Banjul, The Gambia
|
gptkbp:maintenance |
Gambia government
|
gptkbp:material |
steel and concrete
|
gptkbp:opened |
gptkb:1998
President Yahya Jammeh |
gptkbp:passenger_traffic |
approximately 1,000 vehicles per day
|
gptkbp:replaced_by |
gptkb:ferry
|
gptkbp:serves |
road traffic
|
gptkbp:significance |
improves access to Banjul
|
gptkbp:type |
cable-stayed bridge
|
gptkbp:bfsParent |
gptkb:Banjul
|
gptkbp:bfsLayer |
5
|