Statements (67)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Tunnel
|
gptkbp:accessibility |
Limited access for maintenance.
|
gptkbp:archaeologicalFindings |
Rich history since 1841.
|
gptkbp:associatedWith |
London_to_Brighton_Railway
|
gptkbp:built |
4 years.
Water ingress issues. Brunel's_contractors |
gptkbp:communityEvents |
Local events held nearby.
|
gptkbp:communityImpact |
Local tourism boost.
Significant on local transport. |
gptkbp:connects |
Engagement with local community.
Regular maintenance schedule. |
gptkbp:constructionMaterial |
Brick
|
gptkbp:constructionStarted |
1837
|
gptkbp:currentStatus |
Active
|
gptkbp:design |
Victorian engineering
|
gptkbp:dimensions |
Width of 7.3 meters.
|
gptkbp:drainageBasin |
Modern drainage installed.
|
gptkbp:electronicSystems |
Example of Victorian engineering.
|
gptkbp:elevation |
100 meters above sea level
|
gptkbp:emergencyServices |
Regular drills conducted.
Evacuation routes established. |
gptkbp:environmentalImpact |
Wildlife habitat disruption
|
gptkbp:explores |
Ongoing upgrades planned.
Efforts to preserve its history. Natural ventilation used. Ongoing research into its structure. Regular geological surveys conducted. Used for both passenger and freight. Acoustic_panels_installed. |
gptkbp:famousLandmark |
Listed structure.
|
gptkbp:features |
Ventilation_shafts
|
gptkbp:geologicalFeatures |
Clay_and_sandstone.
|
gptkbp:historicalPeriod |
Freight transport
|
gptkbp:historicalResearch |
Studies conducted on its impact.
|
gptkbp:historicalSignificance |
First major railway tunnel in Sussex.
|
https://www.w3.org/2000/01/rdf-schema#label |
Balcombe Tunnel
|
gptkbp:internetAccess |
Limited public access.
|
gptkbp:length |
1,200 meters
3,937 feet |
gptkbp:lighting |
LED lighting installed.
|
gptkbp:localAttraction |
Walking trails nearby.
|
gptkbp:localWildlife |
Bats observed.
|
gptkbp:locatedIn |
gptkb:West_Sussex
|
gptkbp:maintenance |
Regular inspections
|
gptkbp:navigable |
1 in 100.
Accessibility improvements ongoing. Real-time monitoring systems. |
gptkbp:netIncome |
Annual inspections required.
|
gptkbp:notableEvent |
Train derailment in 2000
|
gptkbp:opened |
1841
|
gptkbp:openToPublic |
Monitored by safety teams.
|
gptkbp:owner |
gptkb:Network_Rail
|
gptkbp:partOf |
gptkb:Brighton_Main_Line
|
gptkbp:passenger_traffic |
Rail traffic
|
gptkbp:railwayLine |
gptkb:Southern_Railway
Facilitated growth of rail network. Significant in railway expansion. |
gptkbp:renovated |
2000s
2005 |
gptkbp:rootSystem |
Cut and cover
|
gptkbp:safetyFeatures |
Emergency exits
Complies with national standards. |
gptkbp:serves |
Passenger trains
|
gptkbp:surroundingArea |
Balcombe_village
|
gptkbp:training |
High frequency of services.
|
gptkbp:trainTypes |
Electric and diesel trains.
|