Statements (21)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:capacity |
1500 MW
|
| gptkbp:commissioned |
1984
|
| gptkbp:country |
gptkb:China
|
| gptkbp:dam |
gptkb:concrete_gravity_dam
|
| gptkbp:hasTower |
5
|
| gptkbp:height |
149.5 meters
|
| gptkbp:length |
677.5 meters
|
| gptkbp:locatedIn |
gptkb:Jilin_Province
|
| gptkbp:locatedOnRiver |
gptkb:Second_Songhua_River
|
| gptkbp:operator |
gptkb:State_Grid_Corporation_of_China
|
| gptkbp:purpose |
flood control
irrigation power generation |
| gptkbp:reservoirCapacity |
6.5 billion cubic meters
|
| gptkbp:reservoirName |
gptkb:Baishan_Reservoir
|
| gptkbp:status |
operational
|
| gptkbp:turbineType |
gptkb:Francis_turbine
|
| gptkbp:bfsParent |
gptkb:Baishan_Lake
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Baishan Hydropower Station
|