Statements (19)
Predicate | Object |
---|---|
gptkbp:instanceOf |
electricity transmission network
|
gptkbp:alsoKnownAs |
BRELL
|
gptkbp:country |
gptkb:Belarus
gptkb:Estonia gptkb:Latvia gptkb:Lithuania gptkb:Russia |
gptkbp:established |
2001
|
gptkbp:expansion |
Baltic states plan to synchronize with European grid (ENTSO-E)
|
https://www.w3.org/2000/01/rdf-schema#label |
BRELL ring
|
gptkbp:length |
over 1,000 km
|
gptkbp:operatingSystem |
330 kV
750 kV |
gptkbp:operator |
national grid operators of member countries
|
gptkbp:purpose |
synchronize power grids
|
gptkbp:relatedTo |
IPS/UPS power system
|
gptkbp:status |
operational
|
gptkbp:bfsParent |
gptkb:Estonian_electricity_transmission_system
|
gptkbp:bfsLayer |
7
|