Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:builtFor |
gptkb:Melbourne,_Australia
|
| gptkbp:builtYear |
1992
|
| gptkbp:capacity |
150
|
| gptkbp:derivedFrom |
gptkb:B2-class_tram
|
| gptkbp:fleetSize |
2001
|
| gptkbp:height |
3.29 metres
|
| gptkbp:length |
23.62 metres
|
| gptkbp:manufacturer |
gptkb:Comeng
|
| gptkbp:notableFor |
only one built
|
| gptkbp:numberBuilt |
1
|
| gptkbp:numberOfDoors |
3
|
| gptkbp:operator |
gptkb:Melbourne_&_Metropolitan_Tramways_Board
|
| gptkbp:powerOutput |
4 x 125 kW
|
| gptkbp:preservedIn |
gptkb:Hawthorn_Tram_Depot
|
| gptkbp:status |
withdrawn
|
| gptkbp:trackGauge |
1,435 mm
|
| gptkbp:trialService |
gptkb:Route_96
|
| gptkbp:weight |
32.5 tonnes
|
| gptkbp:width |
2.77 metres
|
| gptkbp:bfsParent |
gptkb:B-class_tram
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
B1-class tram
|