Arun III Hydroelectric Project
GPTKB entity
Statements (28)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:benefit |
gptkb:India
gptkb:Nepal |
| gptkbp:capacity |
900 MW
|
| gptkbp:concessionPeriod |
25 years
|
| gptkbp:constructionStartYear |
2018
|
| gptkbp:country |
gptkb:Nepal
|
| gptkbp:dam |
70 m
466 m Concrete gravity |
| gptkbp:developer |
SJVN Limited
|
| gptkbp:expectedCompletion |
2024
|
| gptkbp:exportPowerTo |
gptkb:India
|
| gptkbp:fundedBy |
SJVN Limited
|
| gptkbp:hasTower |
4
|
| gptkbp:locatedIn |
gptkb:Nepal
gptkb:Sankhuwasabha_District |
| gptkbp:owner |
SJVN Limited
|
| gptkbp:projectCost |
USD 1.04 billion
|
| gptkbp:river |
gptkb:Arun_River
|
| gptkbp:signedBy |
2014
|
| gptkbp:status |
Under construction
|
| gptkbp:tunnel |
11.7 km
|
| gptkbp:turbineType |
gptkb:Francis
|
| gptkbp:type |
Run-of-the-river
|
| gptkbp:bfsParent |
gptkb:Saptakoshi_River
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Arun III Hydroelectric Project
|