Statements (208)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:Space_Launch_System
gptkb:Team_Rocket |
gptkbp:advances |
new technologies incorporated
|
gptkbp:avionics |
modernized avionics system
|
gptkbp:challenges |
faced technical challenges during development
faced various technical challenges during development addressing technical challenges during development |
gptkbp:collaboration |
gptkb:European_Space_Agency
gptkb:European_Union involves multiple countries with multiple countries ESA and CNES |
gptkbp:commercial_viability |
aims for commercial viability
|
gptkbp:community |
growing user community
global satellite operators growing user community anticipated support from scientific community anticipated |
gptkbp:community_outreach |
educational outreach initiatives planned
|
gptkbp:competitors |
gptkb:Space_X_Falcon_9
competes with Space X Falcon 9 |
gptkbp:configuration |
two configurations: Ariane 62 and Ariane 64
A62 and A64 |
gptkbp:control_system |
digital
|
gptkbp:debut |
gptkb:2023
planned for multiple missions scheduled for future launches |
gptkbp:design |
gptkb:Airbus_Defence_and_Space
15 years modular design modular |
gptkbp:design_purpose |
reduce launch costs
|
gptkbp:development |
gptkb:2014
gptkb:European_Space_Agency ongoing since 2014 ESA and CNES 2014 to 2023 development started in 2014 |
gptkbp:development_cost |
approximately €3 billion
over 3 billion euros |
gptkbp:diameter |
5.4 meters
|
gptkbp:durability |
partially reusable
not reusable not designed for reusability |
gptkbp:engine |
Vinci engine
|
gptkbp:engine_type |
gptkb:Vulcain_2.1
|
gptkbp:environmental_concerns |
lower emissions than predecessors
|
gptkbp:environmental_impact |
designed to minimize environmental impact
designed to minimize emissions |
gptkbp:esa |
gptkb:European_Space_Agency
|
gptkbp:european_space_agency |
gptkb:Partnerships
|
gptkbp:first_flight |
gptkb:2023
planned test flights planned test flights before operational use multiple test flights planned conducted test flights prior to operational flights |
gptkbp:fuel_type |
liquid oxygen and liquid hydrogen
|
gptkbp:funding |
supported by public funding
funded by ESA member states funded by European governments |
gptkbp:future_plans |
upgrades and enhancements planned
further developments planned |
gptkbp:guidance_system |
inertial navigation
|
gptkbp:healthcare |
real-time telemetry
|
gptkbp:height |
47 meters
around 47 meters around 62 meters |
gptkbp:home_ground |
modernized ground control systems
|
https://www.w3.org/2000/01/rdf-schema#label |
Ariane 6
|
gptkbp:innovation |
focus on innovation in design and technology
focus on innovation in space launch technology |
gptkbp:integration |
shorter than Ariane 5
vertical integration process reduced integration time shorter integration time than Ariane 5 |
gptkbp:intended_use |
satellite launches
commercial satellite launches |
gptkbp:is_a_supporter_of |
public demonstrations planned before maiden flight
|
gptkbp:launch_date |
gptkb:2023
up to 12 launches per year launch schedule announced for upcoming missions over 300 launches planned |
gptkbp:launch_event |
aims for a high launch success rate
aiming for high success rate |
gptkbp:launch_mass |
around 500 tons
|
gptkbp:launch_platform |
gptkb:Arianespace
integrated launch system |
gptkbp:launch_price |
competitive pricing
lower than Ariane 5 |
gptkbp:launch_service_agreements |
multiple launch service agreements signed
|
gptkbp:launch_services |
provides launch services for various missions
|
gptkbp:launch_site |
gptkb:Guiana_Space_Centre
|
gptkbp:launch_vehicle |
2
two expendable launch vehicle heavy-lift heavy-lift launch vehicle two or four high reliability expected Ariane family new generation launch vehicle part of the Ariane launch vehicle family |
gptkbp:launch_window |
flexible launch windows
|
gptkbp:launched |
streamlined processes
extensive launch preparation required A62 and A64 |
gptkbp:lifespan |
15 years
20 years |
gptkbp:liquid_fuel |
kerosene and liquid oxygen
|
gptkbp:lower_stage |
gptkb:Solid_Rocket_Boosters
core stage |
gptkbp:manufacturer |
gptkb:Arianespace
|
gptkbp:marketing_strategy |
competitive pricing
|
gptkbp:media_coverage |
extensive media coverage
extensive media coverage expected for maiden flight |
gptkbp:mission |
gptkb:European_Space_Agency
gptkb:Kourou,_French_Guiana geostationary transfer orbit missions geostationary transfer orbit aiming for high mission success rate high success rate expected VA251 GTO and LEO missions GTO and LEO expected to support future space missions. planned for various future missions |
gptkbp:mission_duration |
varies by mission
|
gptkbp:mission_type |
various mission types supported
commercial, scientific, and governmental missions |
gptkbp:number_of_stages |
gptkb:ESC-A_upper_stage
gptkb:ESC-A 2 two two stages core stage with two engines |
gptkbp:operational_status |
in development
|
gptkbp:operational_use |
planned for 2023 onwards
|
gptkbp:orbit_type |
geostationary transfer orbit (GTO)
|
gptkbp:partnership |
commercial partnerships established
engaged in commercial partnerships various commercial partnerships established |
gptkbp:partnerships |
collaborations with satellite manufacturers
partnerships with various aerospace companies |
gptkbp:payload_capacity |
gptkb:One_Web_satellites
modular design 5.4 meters vertical integration 5.4 meters in diameter up to 10,350 kg to GTO multiple payload options available multiple payloads possible multiple payload configurations up to 30,000 kg multiple payload deployment capabilities commercial, scientific, and governmental up to 10,500 kg multiple payload deployment options |
gptkbp:price |
lower launch costs than Ariane 5
|
gptkbp:project |
managed by ESA and Arianespace
managed by ESA and CNES scheduled for operational use by 2023 to enhance European access to space managed by Arianespace and ESA managed by Arianespace |
gptkbp:projected_costs |
aims to lower projected costs
|
gptkbp:propulsion |
up to 1,000 k N
|
gptkbp:public_interest |
high public interest
high public interest in launches high public interest in maiden flight high public interest in its development |
gptkbp:purpose |
gptkb:Space_Launch_System
|
gptkbp:regulatory_compliance |
obtained necessary regulatory approvals
regulatory approval obtained for launches |
gptkbp:reliability |
high reliability expected
|
gptkbp:replaces |
gptkb:Ariane_5_ECA
|
gptkbp:safety_features |
redundant systems
enhanced safety measures enhanced safety features enhanced safety features included |
gptkbp:safety_record |
high safety standards
|
gptkbp:sales |
targeting global satellite launch market
|
gptkbp:scheduled_first_launch |
gptkb:2023
|
gptkbp:space_industry_impact |
significant impact on space industry expected
|
gptkbp:spacecraft |
compatible with various spacecraft types
|
gptkbp:specification |
gptkb:advanced_technology
detailed technical specifications available |
gptkbp:stakeholders |
gptkb:European_Space_Agency
engagement with stakeholders ongoing various aerospace stakeholders |
gptkbp:successor |
gptkb:Ariane_5
|
gptkbp:supports |
new generation
new ground support equipment newly developed modernized ground support equipment new ground support equipment required modernized ground systems |
gptkbp:target_market |
commercial satellite launches
commercial satellite operators small to medium satellites |
gptkbp:technology |
advanced avionics
advanced propulsion technology new technologies for cost reduction |
gptkbp:upgrades |
potential for future upgrades
planned future upgrades for enhanced capabilities planned upgrades for performance |
gptkbp:bfsParent |
gptkb:ESA
gptkb:European_Space_Agency gptkb:Ariane_5 |
gptkbp:bfsLayer |
4
|