Statements (21)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:capacity |
86 MW
|
gptkbp:constructionStartYear |
1925
|
gptkbp:country |
gptkb:Ireland
|
gptkbp:dam |
30 m
|
gptkbp:designedBy |
gptkb:Siemens-Schuckert
|
gptkbp:hasTower |
4
|
gptkbp:historicalSignificance |
largest engineering project in Ireland at the time of construction
|
https://www.w3.org/2000/01/rdf-schema#label |
Ardnacrusha power station
|
gptkbp:lengthOfCanal |
12 km
|
gptkbp:location |
gptkb:County_Clare
|
gptkbp:nearestCity |
Limerick
|
gptkbp:notableFor |
first major hydroelectric power station in Ireland
|
gptkbp:opened |
1929
|
gptkbp:operatedBy |
gptkb:ESB_Group
|
gptkbp:partOf |
gptkb:Shannon_hydroelectric_scheme
|
gptkbp:river |
gptkb:River_Shannon
|
gptkbp:status |
operational
|
gptkbp:turbineType |
gptkb:Francis_turbine
|
gptkbp:bfsParent |
gptkb:River_Shannon
|
gptkbp:bfsLayer |
5
|