Ardnacrusha hydroelectric scheme
GPTKB entity
Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:capacity |
86 MW
|
gptkbp:constructionStartYear |
1925
|
gptkbp:country |
gptkb:Ireland
|
gptkbp:dam |
run-of-the-river
|
gptkbp:designedBy |
gptkb:Siemens-Schuckert
|
gptkbp:hasTower |
4
|
https://www.w3.org/2000/01/rdf-schema#label |
Ardnacrusha hydroelectric scheme
|
gptkbp:location |
gptkb:County_Clare
|
gptkbp:notableFor |
first major hydroelectric power station in Ireland
largest engineering project in Ireland at the time |
gptkbp:opened |
1929
|
gptkbp:operator |
gptkb:Electricity_Supply_Board
|
gptkbp:purpose |
electricity generation
|
gptkbp:river |
gptkb:River_Shannon
|
gptkbp:status |
operational
|
gptkbp:turbineType |
gptkb:Francis_turbine
|
gptkbp:website |
https://www.esb.ie/what-we-do/generation-electricity/ardnacrusha-hydro-electric-station
|
gptkbp:bfsParent |
gptkb:Electricity_Supply_Board
|
gptkbp:bfsLayer |
7
|