Ankara–Izmir high-speed line
GPTKB entity
Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:connectsCity |
gptkb:Afyonkarahisar
gptkb:Manisa gptkb:Uşak |
| gptkbp:constructionStartYear |
2012
|
| gptkbp:endPoint |
gptkb:Izmir
|
| gptkbp:expectedCompletion |
2027
|
| gptkbp:length |
508 km
|
| gptkbp:locatedIn |
gptkb:Turkey
|
| gptkbp:maximumSpeed |
250 km/h
|
| gptkbp:operator |
gptkb:Turkish_State_Railways
|
| gptkbp:partOf |
gptkb:Turkish_high-speed_rail_network
|
| gptkbp:purpose |
reduce travel time between Ankara and Izmir
|
| gptkbp:startPoint |
gptkb:Ankara
|
| gptkbp:status |
under construction
|
| gptkbp:bfsParent |
gptkb:Turkish_railway_network
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Ankara–Izmir high-speed line
|